Repair Work
After the leaking from a couple of months back, the damage was finally repaired and rectified. And it was not as simple a job as we imagined it was going to be. There were plenty of plumbing, digging, knocking and finally painting that needed doing. Luckily it was covered by the developer.
But since we were rarely there, the management took their time to do the repairing. And according to the supervisor, they would be finishing the job sometime next week. That should coincide with transfer of ownership of the apartment to is as well by then.
There would still be some polishing needed doing, as well as some minor or touch up of the paint work. I came over to have a look at the place after lunch and to have a word with the supervisor about the repair work. According to him, the plumbing was tricky as some of the parts were custom made and the parquet also needed some expert to.look into the repair.
Hopefully, no more leakage after this. It wasn't the cost so much that we worried about, but the hassle of getting things organised and the time taken to get the repair done.
Reader Comments